1
/
of
28
Joamkil
48 Inch Vesgantti Loveseat Sofa - Solid Wood Legs Throw Pillow
48 Inch Vesgantti Loveseat Sofa - Solid Wood Legs Throw Pillow
Regular price
£168.99 GBP
Regular price
£0.00 GBP
Sale price
£168.99 GBP
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
SPECIFICATIONS
Appearance: Modern Style
Brand Name: NONE
Combination: L-shaped
Fabric: Velvet
Frame Material: Wood
Installation Method: Assembly
Material: Wood,Fabric,Wood
Origin: IT(Origin)
Sofa Width: <2000mm
Share
